(1)Xiao Guo; Huijun Sun. Modeling the morning commute problem   in a bottleneck model based on personal perception. Journal of Advanced   Transportation. 2019,(2019): 6184827.(SCI) (2) Guo   Xiao, sun Huijun. Research on heterogeneous travelers' early peak travel   problem based on bottleneck network. System engineering theory and practice.   2018, 38 (4): 1003-1012. (EI Journal) (3)Guo Xiao, Sun Huijun. Analysis of time of day fare   discounts on urban mass transit travel behavior, crowding and waiting time.   Mathematical Problems in Engineering, 2014,2014: 686705.(SCI) (4)Guo Xiao, Sun Huijun. Reward and Coarse Toll in Competitive   System with Two Modes. The 9th International Conference on Traffic and   Transportation Studies.ICTTS 2014, 205-213, August 1-3, Shaoxing, China.(EI) (5)Mu Yun Dong, Guo Xiao. On-line Rescheduling to Minimize   Makespan under a Limit on the Maximum Sequence Disruption.2009 IITA International Conference on Services Science, management   and Engineering, 2009, 24:479-482.(EI) (6)Mu Yun Dong, Guo Xiao. On-Line Rescheduling to Minimize   Makespan under a Limit on the Maximum Disruptions. 2009 International   Conference on Management of e-Commerce and e-Government, 2009, 9:   141-144.(EI) (7)Mu Yun Dong, Guo Xiao, Yun Hao.Rescheduling to minimize total completion time under a limit   sequence disruption of the parallel batching. 2010 International Conference   on Future Information Technology and computing, 2010, 12: 33-37. (8)Mu Yun Dong, Guo Xiao, Hao Yun.Rescheduling to minimize total completion time under a limit time   disruption of the parallel batching. 2010 International Conference on Future   Information Technology and computing, 2010, 12: 29-32. (9)XuXiao Yan, Mu Yundong, Guo Xiao, Hao Yun.Rescheduling to   minimize total completion time under a limit time disruption for the parallel   batch.Chinese Quarterly Journal of Mathematics, 2015, 30(2): 274-279.(中文核心) (10) Guo   Xiao, Feng Miluo, Mu Mo mo. sequential batch reordering to minimize the total   completion time under the limitation of time dislocation. Journal of   Zhengzhou University (SCIENCE EDITION), 2012, 44 (1): 42-45. (Chinese core) (11) Mu Mo,   PI Junde, Guo Xiao. Sequential batch reordering with minimizing the sum of   completion times under sequence dislocation constraints. University   mathematics, 2012, 28 (4): 68-71  |